Setup & Operations · August 21, 2026 · 8 min read
All About Crypto Mining: Hardware, Coins and Returns
This guide covers the full picture of crypto mining across coins and hardware. It is written from the perspective of a dealer that stocks, bench-tests, ships and repairs this hardware every week from Hong Kong, not from a spec sheet or an affiliate feed.
Search interest in "all about crypto mining" is dominated by two practical questions: what does it cost delivered, and does it earn at my electricity rate. Both are answered below with the arithmetic you can reuse for any machine, followed by the units we currently hold in stock.
Price per Terahash, Not Headline Hashrate
Headline hashrate sells machines; delivered cost per terahash pays for them. Take the landed price — hardware plus freight plus duties — and divide by rated terahash to get a comparable figure across brands. That normalised number is how professional buyers shortlist hardware in all about crypto mining and it routinely reorders the ranking you get from marketing pages.
Then weigh capital efficiency against efficiency. Cheap power favours low purchase price and tolerates higher J/TH; expensive power demands current-generation efficiency even at a premium. There is no single right answer, only the right answer for your rate and your holding period.
Thermals, Noise and Where the Machine Will Live
Air-cooled ASICs run at 72 to 80 decibels — comparable to a vacuum cleaner that never stops — and dump their entire electrical draw into the room as heat. That makes them fine for a warehouse or an insulated outbuilding and unpleasant anywhere near living space. Hydro and immersion units are near-silent because the noise source is the pump loop, not high-static fans.
Plan intake and exhaust so hot air never recirculates into the intake. Separate hot and cold aisles physically, run slight positive pressure with filtered intake so dust is pushed out rather than drawn in, and size total CFM with margin for filter loading. Recirculation is the most common cause of unexplained hashrate loss.
Electrical Requirements and Circuit Planning
Nearly all modern ASICs need 200-240 V at roughly 16 to 20 amps per machine, which is a dedicated circuit, not a household outlet. Allow about 3.5 kW per air-cooled unit and add 15 to 20 percent headroom for inrush, ventilation and lighting. A 200 A three-phase 208 V service supports roughly 20 machines at full load.
Use properly rated PDUs, never daisy-chain, and have a licensed electrician sign off the design before energising anything. Send us your panel schedule and we will return a circuit plan mapped to the exact machines in your order so the fleet earns from day one rather than week three.
Firmware, Pools and Day-One Configuration
Keep firmware current but conservative. Manufacturer releases usually improve stability and thermal management; aggressive third-party overclock profiles raise voltage and shorten hardware life. If you do tune, do it on hydro or immersion machines where coolant temperature sets the ceiling, and watch results closely for the first month.
Point the fleet at one pool standard with a worker naming scheme you can read at a glance, and send payouts to a wallet you control rather than an exchange deposit address. Set alerting on hashrate deviation and per-board temperature spread so a failure shows up in minutes, not on the next invoice.
Maintenance, Spares and Real Operating Costs
Dust is what kills mining hardware. It insulates heatsinks, raises junction temperatures and accelerates solder fatigue. Compressed-air cleaning quarterly and a full ultrasonic hashboard clean annually add years of usable life. Treat fans as consumables and replace them proactively at around two years — a stalled fan can cook a board in minutes.
Budget five to eight percent of hardware value per year for operations: PDUs and cabling, filtration, a spare PSU and hashboard per ten machines, and the labour hours nobody puts in a spreadsheet. Watch temperature spread across board sensors rather than peak temperature; a widening spread predicts failure weeks in advance.
Buying Safely: Verification Before Payment
The risk in this market is almost never the silicon — it is the transaction. Insist on a named legal entity, a verifiable phone number, a written warranty term, an invoice issued before funds move, photographed serial numbers of the actual units, and a bench-test report showing hashrate and per-board temperatures from a real run.
Every machine referenced in this guide is listed on our catalogue with a live price, a bench-test report and a photograph of the unit you receive. Orders are paid in major cryptocurrencies using QR-code addresses with transaction verification, and nothing ships until payment is confirmed against an issued invoice.
Shipping Worldwide from Hong Kong
We ship from our Hong Kong facility by DHL and FedEx air freight with commercial invoices, HS codes and EORI or VAT documentation where required. Typical door-to-door transit is three to seven business days to the USA, Canada, the UK and Europe, with sea freight available for container-scale orders where the saving justifies the timeline.
Duty treatment varies by destination, so ask for a landed-cost figure rather than a hardware price when you compare suppliers. A machine that looks cheap ex-works often is not once freight, duty and import VAT are added, and that difference changes payback by weeks.
Frequently Asked Questions
- What payment methods do you accept?
- Payment is in major cryptocurrencies — Bitcoin, USDT, Bitcoin Cash, BNB and Dogecoin among others. You choose the asset, pay to the QR-coded address shown at checkout, submit the transaction ID, and the order is released once the payment is verified against your invoice.
- Is there a warranty on used machines?
- Yes. Used units ship with a written warranty, commonly 30 to 90 days depending on model and grade, covering dead-on-arrival hashboards and PSU failure. New hardware carries manufacturer warranty, and our repair centre performs board-level work beyond the warranty window.
- Can I run all about crypto mining at home?
- Only with a dedicated 200-240 V circuit, somewhere the 72-80 dB of an air-cooled unit will not be a problem, and a plan for the heat. Hydro and immersion machines are far quieter and suit basements and garages, but they need a coolant loop and a heat rejection path.
- How do you test hardware before shipping?
- Every unit runs on our bench under load, and we record hashrate against rated output, per-board temperature spread, fan RPM and PSU behaviour. You receive that report plus photographs of the serial numbers on the machines actually reserved for your order.
- Is all about crypto mining a good buy at my electricity rate?
- Under about six cents per kilowatt hour, cheap previous-generation hardware usually pays back fastest. Above ten cents, only current-generation efficiency in the 12-18 J/TH band holds margin. Send us your rate and capacity and we will model the specific machines that make sense before you spend anything.
Recommended Miners From Our Inventory
Hardware in stock that matches this guide. Every unit is bench-tested and hashrate-verified before it ships.

Bitmain Antminer S21j XP Hydro 495 TH/s Bitcoin Miner
495 TH/s | 5940W
SHA-256 · New
$6,579

Bitmain Antminer S21 XP+ Hyd. 480 Th/s Bitcoin Miner
480 Th/s | 5280W
SHA-256 (Bitcoin) · New
$9,120

Bitmain Antminer S21j XP Hyd. 495 Th/s Bitcoin Miner
495 Th/s | 5940W
SHA-256 (Bitcoin) · New
$8,415

Bitmain Antminer S21 XP Hyd. 473 Th/s Bitcoin Miner
473 Th/s | 5676W
SHA-256 (Bitcoin) · New
$8,041

Used Bitmain Antminer S21 Pro 234 Th/s Bitcoin Miner
234 Th/s | 3510W
SHA-256 · Used
$3,990$4,290

Used Bitmain Antminer L7 9.5 Gh/s Hydro-Converted Scrypt Miner
9.5 Gh/s | 3425W
Scrypt (DOGE & LTC) · Used
$4,490$4,790
Want the numbers run for your site?
Send us your electricity rate, available amperage and budget. We will model the machines that actually pay back at your power cost — no obligation.
Talk to an engineer